Luke Elementary was an existing school in need of a renovation. This project had special circumstances as construction began during the end of the school year. It was critical to construct this project with a minimum amount of disturbance to children as they attended classes. Accelerated scheduling was necessary in order to have the new school open for students returning from summer vacation. Our clients know that when they need a sub-contractor who can present themselves in a professional manner and get the job done they need look no further than Concrete Structures, Inc.
|
| Client |
DL Withers |
| Size |
4,350 CY |
| Year |
2007-2008 |
|