Valley Vista Performing Arts Center was constructed at an existing high school. This building was the crown jewel of a beautiful campus. Intricate forming and carpentry was required in order to build an orchestra pit and stadium style seating. Finishing tolerances in such high traffic areas make many concrete sub-contractors wince but Concrete Structures relishes the chance to show what professional master craftsmanship should be. In construction the low bidder is not always the most qualified but when Concrete Structures is awarded a project the client knows that they are in good hands.
|
| Client |
DL Withers |
| Size |
3,000 CY |
| Year |
2007-2008 |
|